Continuing work in Roujanby Amy@projects4missionsNovember 10, 2023 After the walls and ceiling were covered with dry-wall (plasterboard), we created a sound-absorbing panel in the back of the auditorium, and finished that section with wood slats. Tags:France 2023 1 thought on “Continuing work in Roujan” George Wood November 11, 2023 at 11:29 pm Looking good Comments are closed.
Looking good
Comments are closed.